Kelly (23 page)

Read Kelly Online

Authors: Clarence L. Johnson

BOOK: Kelly
11.05Mb size Format: txt, pdf, ePub

The lesson I learned early from Hall Hibbard about not
driving people has served the Skunk Works well. People challenged to perform at their best will do so. With rare exceptions, long hours are not encouraged.

Skunk Works insignia
.

“If you can’t do it with brainpower, you can’t do it with manpower—overtime,” is axiomatic with me.

Our aim is to get results cheaper, sooner, and better through application of common sense to tough problems. If it works, don’t fix it.

“Keep it simple, stupid”—KISS—is our constant reminder.

“Be quick, be quiet, be on time,” is another of our mottos.

“Listen; you’ll never learn anything by talking. The mesure of an intelligent person is the ability to change his mind.”

These concepts save time, money, and people.

The Skunk Works at Lockheed has moved four times since the first shop was constructed of engine boxes and a tent in 1943, and its first project, the XP-80 jet fighter, was built with just 120 people in 143 days. There were only 23 engineers on the project. There were 37 engineers on the JetStar corporate transport. The U-2 many years later employed a total of 50
people on both experimental and production engineering. On the enormously more difficult SR-71, there were only 135 engineers.

The present Skunk Works No. 5 was christened by Althea in January 1963. By that time, the organization had turned out 17 major projects and participated in two others.

Another secret of the Skunk Works that is no secret is our human relations. The Skunk Works never has had any serious labor problems. We’ve had fine relations with the union. The union president would listen and be responsive when we told him our problems. His stewards would, too. At the test base in Nevada, I would meet with union stewards to hear their problems—which were real and many—and always try to do something about them.

On one occasion when Lockheed was threatened with a strike, Tom McNett, then president of IAM Lodge 727, told me, “Kelly, of course, we won’t strike the Skunk Works.”

There was a strike, briefly. The Lockheed plant as a whole historically has had excellent labor relations. The company was used, in fact, as the example in a government booklet, “Causes of Industrial Peace,” published in the early ’40s.

While the union had to make a token protest at the Skunk Works, pickets were stationed off to the side of our main gate. They let us operate.

I personally have had perhaps 20 or 30 union grievances filed against me over the years for performing work of some kind that a mechanic should have done. An example was welding a door fitting for the JetStar in my shop at home. But this has all been without hard feelings. I’ve always thought the employees actually enjoyed the fact that their top boss cared enough to work right along with them.

One of my challenges to employees is a standing twenty-five cent bet against anyone who wants to differ with me on anything. I keep a supply of quarters on hand. It’s not the quarter, of course, but the distinction of winning it—to be able to beat the boss. It’s another incentive. And I’ve lost a few quarters, too.

It is our practice to put the people in close contact with the airplane while it is being built so that they can follow it throughout its development. They feel responsible for the parts they make. If a part needs fixing, it will be fixed quickly.

On engineering changes, we go out of our way to explain them to all who will be working on them. We maintain a very close liaison from me to the designer, to the purchasing agent—so that he understands the urgency in acquiring materials; to the tooling people; and to the people who actually will build any part of the plane. That carries through from the first line I draw on paper to completion of the airplane and its first flight.

It long has been my practice to see that all those closely connected with a project witness the first flight. This dates from the days of our first Skunk Works airplane, the XP-80. We bussed our crew to the desert test base for the flight and had a party afterwards, with the Indian wrestling matches that became a sort of tradition.

Involving families of employees whenever possible is important, too. When we christened the present Skunk Works, we held an evening party in the new plant for all employees and their families. We told them as much as we could about our work. The next day we went back to strict security with no admittance without need.

Security regulations necessarily are impersonal and unyielding. An excellent engineer, a fine and honorable person, can marry someone who might have a relative with political views unacceptable to our government, for example, and thereby become unemployable in a secret operation. It was painful, but I have had to say goodbye to a good friend for such a reason.

Most companies, while desiring the benefits, will not pay the price in revised methods and procedures for setting up a Skunk Works-type of operation. They will not delegate the authority to one individual, as Lockheed did in my case from the very first Skunk Works. It requires management confidence and considerable courage.

Without the authority assigned to the Skunk Works by our
military customers and the Lockheed corporation, we would not have been able to accomplish many of the things we have done, things about which I felt we could take a risk—and did.

The theory of the Skunk Works is to learn how to do things quickly and cheaply and to tailor the systems to the degree of risk. There is no one good way to build all airplanes.

I believe that the designer and builder of an airplane also should test it. That is important to his ability to design future aircraft. I always have thought of flight testing as a method of inspection—to see how well you have engineered and built the bird. Working with pilots in testing and development has taught me a great deal over the years. Pilots are a special breed for whom I have a deep admiration and respect. When the day comes, if ever, when we do not have responsibility and authority to test the airplanes as we design them, then from that day on our design ability diminishes. We will lose competency to develop new aircraft.

There is a tendency today, which I hate to see, toward design by committee—reviews and recommendations, conferences and consultations, by those not directly doing the job. Nothing very stupid will result, but nothing brilliant either. And it’s in the brilliant concept that a major advance is achieved.

Development of some of this country’s most spectacular projects—the atom bomb, the Sidewinder missile, the nuclear-powered submarine—all were accomplished by methods other than the conventional way of doing business outside the system.

Operating at its best on our Air Force programs, the Skunk Works could get an almost immediate decision on any problem. I could telephone Wright Field, Dayton, for example, talk to my counterpart who headed the small project office there for the military—and who was allowed to stay with it to conclusion—and get a decision that same morning. Now, that’s just not possible in standard operating procedure. It’s a difficult concept to sell for the first time, though, since it means abandoning the system.

As well as giving us the authority we needed, Lockheed also gave us the tools. The importance of a research capability is basic to advanced engineering design. Lockheed management from its earliest days has been far-seeing in this regard. The company not only built the first privately-owned wind tunnel in the industry—back when we were working on the P-38—but today in its Rye Canyon Research Center operates the most complete advanced research and test facilities integrated at one site of any aerospace company. (It was renamed the Kelly Johnson Research and Development Center in 1983.)

In 1954, when I was chief engineer, I was able to get Messrs. Gross, Chappellet, and Hibbard to commit $100,000 for study of such a center. Requirements outlined at the time included test tunnels of supersonic capabilities. Today, there are hypersonic, hypervelocity, and propulsion tunnels, space chambers, laboratories in electromagnetics, cryogenics, acoustics, thermal systems. The ability to “fly” an airplane on the ground and through several simulated lifetimes of service using various mockups has become a science in itself. Long before an airplane ever is assembled for flight testing, we now know quite precisely how it will fly, what kind of maneuvers it can perform, the shortcomings of its systems, and any elements that may be likely to fail. Without these excellent research tools, the Skunk Works would not have been able to build and fly the advanced aircraft it has produced.

Before the decision was reached to locate the new research center on several hundred acres in Rye Canyon—a relatively remote and ruggedly beautiful setting in the foothills of the San Gabriel Mountains—we investigated other potential sites.

The final selection of Rye Canyon was influenced by its convenience to the Burbank and Palmdale plants, being about equidistant to both. And the surrounding foothills would provide privacy and act as sound barriers to contain the noise from our tunnels and other test facilities. An original 200 acres purchased in 1958 has been expanded to some 500 today. This research headquarters is entirely company-funded. The laboratories perform work under contract to other divisions of Lockheed—as
well as other companies and government agencies when time is available.

At the Skunk Works, a typical day for me would start about 7 a.m., except in a crisis situation when I would arrive at six o’clock to make up for the three hours’ time difference with military offices in Washington. Generally, I would hold a meeting with the engineers working on the key problems. Almost always the group included my three top assistants—we’re short on titles in the Skunk Works: Dick Boehme, Rus Daniell, and Ben Rich, my successor as head of ADP today. Ben is one of the few persons to win one of my quarters. The bet was over how many degrees’ temperature change painting the Oxcart would mean. I guessed it would lower inflight skin temperature 25 degrees. Ben, a thermodynamicist, guaranteed 50 degrees, and he was right. It was 52 degrees.

These morning meetings were short and informal. I liked to sketch on a pad of unlined yellow paper the specific work we should do and outline the program for the day or week. The pads of lined paper that most engineers use I find inhibiting. It was nine years before I discovered that my loyal secretary, Verna Palm, was having these pads of unlined yellow paper made up especially for me. I had thought I was being frugal and using inexpensive scratch paper. Verna was my first secretary when I became chief research engineer. Hibbard, with typical generosity, let her leave his office and work for me because he knew it would help me in my new position to continue to work with the secretary we had shared. She stayed with me for 18 years, until her retirement.

When Skunk Works principles really are applied, they work. An example of their successful application was development of the Agena-D launch vehicle. The Rand Corporation has recorded it in a report available to anyone interested.

The satellite that was to become this country’s workhorse in space was in trouble in terms of design and cost but especially in reliability, which stood at an incredibly low 13.6 percent. I was drafted, in effect, to go up to the Lockheed Missiles and Space Company and fix it. We set up a Skunk Works operation
with the company’s design project engineer, Fred O’Green, as head. Air Force Col. “Hank” Cushman was the customer’s counterpart.

O’Green’s excellent performance later attracted the attention of Litton Industries, where he became president, and then chairman of the board. Cushman was promoted to general and put in charge of the Air Force’s Armament Division at Eglin Field, Fla.

It proved again our axiom: If you have a good man and let him go, he’ll really perform. In terms of today’s world, that axiom should apply to women as well.

When I first reviewed the Agena project, I discovered that 1,206 people were employed in quality control alone, achieving only that 13 percent reliability factor! It should have been the world’s most reliable vehicle just using the inspection department. That was enough people to design and build the thing.

At the Baird Atomic Company, which made the vehicle’s horizon sensor, Lockheed had 40 people inspecting, coordinating, and reporting. Yet Baird had only 35 people building the instrument. We resolved that situation by returning responsibility for the product to the vendor. For example, I telephoned Walter Baird personally since he and I had worked together on a number of other Skunk Works projects. He immediately agreed to pick up his end of the log.

The same understanding was reached with the other vendors. It’s a basic principle of delegating authority. Suppliers and others associated with a project must be extended the same kind of rules and permissions that are given us for the entire program. This cuts red tape and costs and allows all participants to concentrate on the product instead of a system. It is so simple.

Other measures taken saved the government at least $50 million on costs. This application of Skunk Works methods completed in nine months what had been scheduled for 18. Some 350 drawings were created against a projected 3,900, and quality control personnel were slashed to 69. Tooling costs were reduced from a projected $2,000,000 to $150,000, and
procedures were established to turn out design drawings in a single day instead of one month. These measures demonstrated results. In the first twelve launches, reliability was 96.2 percent.

Other books

On His Turf by Jennifer Watts
Fused (Lost in Oblivion #4.5) by Cari Quinn, Taryn Elliott
The Books of the Wars by Mark Geston
A Kiss Before Dying by Ira Levin
The Judgement Book by Simon Hall
The Honoured Guest by Destiny, Aurelia
Secrets in the Cellar by John Glatt