Authors: Mike Magner
On December 19, 1975, Ensminger graduated and was assigned to stay at Parris Island. He immediately headed north to Camp Lejeune to pick up his pregnant wife and daughter. When he arrived, Etsuko was working hard to clean out their quarters so it would pass the series of inspections the Marine Corps required before anyone could move out. But Jerry Ensminger was anxious to have his family back together again. “I said to hell with it and hired a company to clean it that guaranteed you'd pass inspection,” he said. “There was a payoff of course; they operated with kick-backs. I just wanted to get out of there.”
At Parris Island, twenty-three-year-old Master Sergeant Ensminger was in the best conditionâboth physically and mentallyâof his life. “I had muscles in my shit,” he laughed. And he knew how to work recruits, berating them during the rigorous drills with favorite phrases, such as “Did your mother have any children who lived?” and “You are a paraplegic piece of pig shit!”
Janey Ensminger was born on July 30, 1976, at the Buford Naval Hospital near Parris Island. The baby girl seemed perfectly normal, though she never crawledâshe rolled, her father said. “She learned to get up on her knees and rolled to the left.” By the time the family moved back to Camp Lejeune in 1982, she was a precocious, fun-loving, and very active child. The Ensmingers moved into a house off the base at the time, but Jerry and Etsuko frequently took Janey and her two sisters (another daughter, Veronica, had also been born at Parris Island) to use the swimming pools at Camp Lejeune.
The problems began in the late spring and early summer of 1983, around the same time the Ensmingers were planning a trip to Pennsylvania for the wedding of Jerry's sister. Janey, a few months
shy of seven years old, came down with a case of strep throat that she couldn't seem to shake. “We were going to cancel the trip to Pennsylvania, and then she got better, so we went,” Ensminger said. “But then in Carlyle I had to take her to the base hospital. She got worse.”
The family returned to North Carolina and Janey was still not feeling well. “I stayed home with her when we got back,” Ensminger said. “It was on a Sunday in July and she got really hot. I was putting cold compresses on her and when I took off her shirt I noticed little hickeys on her back.” Ensminger didn't know what they wereâhe learned later they were petechiae caused by hemorrhaging beneath the skinâbut he knew they were a bad sign, and he rushed Janey to the base hospital.
“It was crowded, on a Sunday, but luckily my battalion surgeon was on duty and he ordered blood work,” Ensminger said. “I could tell something was wrong, the way they were looking at her.”
After waiting for what seemed like an eternity, and with his patience wearing thinâ“I was ready to leap over the desk to demand an explanation,” he saidâthe doctor finally called Ensminger back behind the counter while Janey was brought back into the waiting room with a Navy corpsman. The doctor said he had been waiting for the head of pediatrics to come but felt he couldn't hold off any longer, Ensminger said. “Your daughter has leukemia,” the doctor told him.
“I went to my knees right there on the tile floor and my forehead hit the tile,” Ensminger said. “I started to sweat and shake. I was going into shock. The doctor got me up and I said, âI've got to get hold of myself.' Janey was there with a female corpsman and I needed to go to her.”
Janey's blood platelet count was very low. The hospital had to have a supply flown in so the girl could make it through the night. The next day, Jerry and his wife arranged to have their daughter
transferred to the Naval Medical Center in Portsmouth, Virginia, one of the military's top medical facilities.
When the first state regulations for groundwater quality in North Carolina took effect in 1983, Rick Shiver of the state's Department of Environment and Natural Resources was charged with overseeing their implementation in Onslow County and other parts of the coastal region. Shiver had actually lived at Camp Lejeune as a boy from 1954 to 1963 while his father was stationed there, and he had made many visits back since joining the state agency in 1973, having been assigned to Onslow County in 1978. So he was well aware of the base's operations and the fact that for decades a variety of hazardous materials had been dumped at numerous locations around the 220-square-mile installation. Julian Wooten and Danny Sharpe, the two environmental supervisors on the base in the 1970s, had even taken Shiver on a tour of many of these disposal sites in the mid-1970s.
It wasn't until July 1984, though, that Camp Lejeune's recently hired environmental engineer, Bob Alexander, showed Shiver the results of the 1980 and 1981 tests for trihalomethanes that indicated the presence of solvents in samples from the Hadnot Point and Tarawa Terrace water systems. Shiver was surprised that base officials hadn't done anything since to try to pinpoint the source of the contaminants. The large water systems on the base were served by as many as thirty wells, and if a test for the entire system showed contamination, it was likely the amount was diluted by water from clean wells. “I would have tested the wells individually,” Shiver said.
3
Bert Mundt, a water plant operator at Camp Lejeune from 1973 to 2004, didn't find out about the tests until years later, but he was convinced that base officials knew some of the water contained
potentially harmful levels of toxic chemicals in the early 1980s. “They were perfectly aware,” Mundt said in an interview. “They were just hoping it was diluted enough that it wouldn't be a problem.” Base commanders didn't want to know if individual wells were contaminated, Mundt said, as the general foreman, W. R. Price, had written in 1983 that any shutdowns would have made it very difficult to meet summer demands for water.
The top managers at Camp Lejeune also felt justified in not spending money to test each of the dozens of wells on the base because they believed that any problems would be found and addressed in the Navy's environmental assessment and cleanup program,
NACIP
. After the initial assessment study, completed in 1982, which had identified more than seventy dumping sites on the base and recommended further assessment, the second phase, a verification study, was started in May 1984 by another Florida consulting firm, Environmental Science and Engineering, Inc., “to determine existence and possible migration of specific chemicals” at twenty-two locations at Camp Lejeune. “The objective of the verification step is to determine whether specific toxic and hazardous materials identified in the Initial Assessment Study, and possibly other contaminants, are present in concentrations considered to be hazardous,” according to the “work and safety plan” prepared for the consultants by
LANTDIV
, which was overseeing
NACIP
at Camp Lejeune.
4
A notice about the study was placed in a base newspaper,
The Globe
, in June 1984 so that residents would be prepared for workers in spacesuits digging around various sites at Camp Lejeune. The crews would be wearing protective gear, but “we do not expect to expose anyone to any contaminants,” advised Colonel M. G. Lilley, assistant chief of staff for facilities, in the article.
5
In the meantime, Shiver of the state environmental department started snooping around on his own for possible sources of
groundwater pollution. He noticed that within a short distance of one of the Tarawa Terrace wells that had tested positive for solvents, there were three cleaning establishments and a gas station that would have storage tanks for chemicals and fuel. It didn't take long to identify the worst operation of the bunch. ABC One-Hour Cleaners, a thirty-year-old dry-cleaning service at 2127 Lejeune Boulevard, was directly across the highway from Tarawa Terrace. Shiver went to the service and asked the workers to show him around. “I observed solvent leaking from a big tank or its piping system and draining across a cement floor to a sump,” Shiver said in an interview with federal investigators in 2004. “The sump pumped the liquids to a septic field. I realized that ABC Cleaners was the probable source of contamination at Tarawa Terrace.” His suspicions were confirmed after three test wells were drilled and sampling showed that a plume of solvents in the groundwater, including tetrachloroethylene (or perchloroethylene,
PCE
), was migrating directly toward the housing area on the other side of the highway.
6
At this point, some in the Marine Corps leadership thought all the water problems at Camp Lejeune had suddenly been solved. A commercial polluter was responsible for contamination moving into the base wells and would be forced to clean up the mess at its own expense. It didn't take long for that bubble to burst.
On November 30, 1984, the environmental staff at Camp Lejeune received an urgent call from the Navy engineers at
LANTDIV
. A test on a drinking-water well very close to the Hadnot Point fuel farm showed the presence of benzene and several solvents. The levels found included 121 parts per billion for benzene, an astounding 1,600 ppb for trichloroethylene (
TCE
), 630 ppb for trans-1,2-dichloroethylene (or trans-1,2-
DCE
, a solvent contained in many products, including waxes and resins), and 24 ppb for 1,1,2,2-tetrachloroethane (1,1,2,2-
T
e
CA
, mostly found in oils and
lubricants). The well was immediately shut down. But this time the problem could not be blamed on ABC Cleaners. Not only was the well far from the cleaning service, the benzene was a telltale sign of fuel in the water, not cleaning solvents.
Less than a week later, on December 6, 1984,
LANTDIV
provided test results on samples from seven other wells serving the Hadnot Point water system. One showed benzene at 720 ppb and both
TCE
and trans-1,2-
DCE
at levels above 300 ppb; another well had
TCE
at 230 ppb. Both of those wells were shut down. The other five wells had only small traces of solvents, including levels of methylene chloride, also known as dichloroethane (
DCE
), that were determined to be the result of laboratory contamination. But the findings at Hadnot Point were alarming enough for
LANTDIV
engineers and the base environmental staff to decide to have every water well at Camp Lejeune tested for volatile organic compounds, or
VOC
s, starting in January 1985.
7
Those tests were barely under way one day in late January when the wife of Camp Lejeune's chief of staff smelled fuel in her water at the officers' housing on Paradise Point. The area was served by the Holcomb Boulevard water system, which also pumped water to housing areas at Berkeley Manor, Watkins Village, Hospital Point, Midway Park, and Stone Street. When maintenance workers checked the pumping station at Holcomb Boulevard, they discovered a fuel line leaking directly into a water tank, sending fuel throughout the system, including the tap water in the chief of staff's quarters. If that didn't get the attention of base commanders, nothing would.
Utility operators at the base, assuming that after
LANTDIV
's December 6 report all the contaminated wells in the Hadnot Point system had been discovered and removed from service, shut down the Holcomb Boulevard system and replaced it with water from Hadnot Point, using a tie-in line that connected the two systems.
The Hadnot Point water would be pumped into both systems for more than a week until the Holcomb Boulevard lines were flushed.
After several days of pumping from Hadnot Point, tests were conducted on water samples taken from taps throughout the Holcomb Boulevard system to make sure the fuel contamination was disappearing. What was found in samples pulled from drinking-water fountains at the Berkeley Manor Elementary School on January 31, 1985, was shocking: the solvent
TCE
was measured at more than 1,100 parts per billion.
The solvent had to be coming from the Hadnot Point system, and sure enough, another contaminated well was discovered there that had not been tested earlier. This one, located near an old dumpsite, would show levels of
TCE
at a whopping 18,900 parts per billion,
DCE
at more than 8,000 ppb, and
PCE
at around 400 ppb. Considering that three other contaminated wells were now shut down in Hadnot Point, and more than 1,000 ppb of
TCE
were still being found in a school's drinking water because of this one well, it can only be assumed that levels of
TCE
in the drinking water from the Hadnot Point system may have been even higher when all four contaminated wells were online.